Al-Ghadeer Mosque Rehabilitation Project

Boabat Alnoor carried out the comprehensive rehabilitation and refurbishment of Al-Ghadeer Mosque within the Al-Zubair Oil Field for ENI / ZFOD, covering electrical, civil, architectural, HVAC, plumbing, sanitary, interior finishing, and furniture works.

Boabat Alnoor carried out the comprehensive rehabilitation and refurbishment of Al-Ghadeer Mosque within the Al-Zubair Oil Field, Basra, Iraq, for ENI / ZFOD. The project combined electrical, civil, architectural, HVAC, plumbing, sanitary and interior works to improve the facility's safety, functionality, comfort and overall appearance.

Scope

The project involved a coordinated upgrade of the mosque's building infrastructure and internal facilities. Boabat Alnoor's scope included:

  • Installation of new electrical distribution panels and electrical cables.
  • Installation of new internal and external lighting systems.
  • Installation of a new air-conditioning and cooling system.
  • Installation of new roof tiles.
  • Installation of fire- and moisture-resistant gypsum board ceilings.
  • Installation of decorative gypsum board ceiling works.
  • Installation of new ceramic tiles, bathroom fixtures and accessories.
  • Complete rehabilitation and replacement of the sanitary and drainage system.
  • Installation of new plumbing connections and sanitary facilities.
  • Replacement and installation of new furniture.

Electrical works

The mosque's electrical infrastructure was upgraded through the installation of new electrical distribution panels, electrical cabling and new internal and external lighting systems. The improvements provide the electrical infrastructure required to support the refurbished facility and its building services.

HVAC & building works

A new air-conditioning and cooling system was installed to improve indoor environmental conditions. The building works also included new roof tiles and fire- and moisture-resistant gypsum board ceilings, together with decorative gypsum board ceiling works to upgrade the mosque's interior finish.

Plumbing & sanitary facilities

The sanitary and drainage infrastructure was comprehensively rehabilitated and replaced. New plumbing connections and sanitary facilities were installed, together with new ceramic bathroom tiles, fixtures and accessories.

Interior refurbishment

The rehabilitation extended to the mosque's internal environment, including the replacement and installation of new furniture and upgraded finishes. The works were coordinated with the new lighting, cooling, ceiling and sanitary systems to provide a complete refurbishment of the facility.

Project outcome

The completed project improved the mosque's electrical infrastructure, lighting, cooling, roof protection, ceiling finishes, sanitary facilities and interior environment, providing a safer, more comfortable and more functional facility for its users.