Boabat Alnoor holds the integrated supply and maintenance contract for the electrical submersible pump (ESP) well power station systems across the Zubair oil field. It is the company’s largest and longest-running operation: a continuous, field-wide service covering every generator that keeps an ESP well producing.
The contract is a full operate-and-maintain scope rather than a discrete build. Boabat Alnoor is responsible for keeping the well power stations available around the clock, which covers:
The maintained fleet covers 428 generator sets spread across 258 well locations. Ratings run from 380 kVA to 1,250 kVA, with 500 kVA the most common unit. The fleet is mixed: Perkins, Doosan, Volvo Penta and Cummins engines all sit within the same maintenance programme, which means the crews and the spare-parts operation have to carry competence across four engine makes at once.
Delivery is organised into ten site teams plus a dedicated ZFOD-IR team, each holding a defined set of wells, supported by the central workshop and a field stores operation. The workforce on the contract is approximately 200 people — local staff and expatriate specialists working a rotation.
Safety is run as a daily practice rather than a document: toolbox talks before work starts, permit-controlled activities, and hazard identification briefed to every crew on site.
Boabat Alnoor runs the contract on three in-house systems it built and operates itself, rather than on spreadsheets:
The result is that fleet availability, spares consumption and manpower are reported from live data, and the client sees the same numbers the crews work from.